Prefabricated Light Steel Structure Fabrication Frame Building Industrial Construction Warehouse (KXD-pH22)

Prefabricated Light Steel Structure Fabrication Frame Building Industrial Construction Warehouse (KXD-pH22)

Prefabricated Light Steel Structure Fabrication Frame Building Industrial Construction Warehouse (KXD-PH22)Prefabricated
Basic Info
Model NO. KXD-PH22
Member Steel Column, Steel Beam, Steel Truss
Type of Steel For Building Structure H-Section Steel
Carbon Structural Steel Q235
Residential Wall Structure Wallboard
Application Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Walkway and Floor, Steel Structure Bridge, Feed Chicken, Layer
Material Steel Structure
Certification ISO, CE, SGS, BV
Customized Customized
Size According to Customers′ Requirement
MOQ 200m2
Main Structure H Section Welded Steel Structure
Color According to Customers′ Requirement
Roof and Wall Material Color Steel Sheet/Sandwich Panel
Steel Grade Q235B, Q345b
Window Aluminum Alloy Window or PVC Window
Door Sliding Door
Surface Treatment Painted or Galvanized
Steel High Strength Steel
Transport Package Seaworthy Package for Steel Chicken House
Specification SGS/ISO/BV
Origin Qingdao, China
HS Code 9406900090
Production Capacity 3000ton/Month
Product Description
Prefabricated Light Steel Structure Fabrication Frame Building Industrial Construction Warehouse (KXD-PH22)Prefabricated steel structure buildings - Optimal solution for your projectsIf you want a building that has cost saving, fast erection, good quality control, high durability, steel structure buildings will be the best choice.As the latest trend in building construction, steel structure buildings increasingly confirmed their outstanding advantages in agricultural, industrial and commercial projects such as warehouse, workshop, factory, storage, showroom, office building, supermarket, school, stadium, logistics center, etc…What is prefabricated steel structure building?Steel structure building is built over three members connected to each other by bolts and screws:Primary members (columns, beams)Steel columns will be H section steel, square tube steel according to different type of buildings. Steel beams are usually H section steel.Secondary members (C or Z purlins, bracing...)Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel)Other building components (Rolling doors, aluminium windows, etc.)The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection.At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times.These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.Why choose steel structure buildings?1. Cost SavingsPrice per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.2. Quality ControlDesigned and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.3. Quick ErectionAll steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.4. FlexibilitySteel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.5. Energy EfficiencyNowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.How to build a steel building with KXD?Each of KXD's steel building is custom-made to meet the needs of our customers with high performance, efficiency and international quality standards.Factors affecting the price of steel structure building:1. Steel raw material priceFluctuations of steel raw material price have impact on the price of steel structure building. The big change in steel price will directly cause the overall price of steel structure building to change.2. LoadLoad includes wind load, snow load, dead load, and live load. The engineers calculate the steel structure Qty. based on the load. Large load, more steel structure will be used.3. The span of the steel frameUsually, the span of steel frame will controlled in 36m. The larger of the span, the greater the amount of steel structure per square meter. If the steel frame has a large span and no center pillar, the amount of steel used will increase.4. StructureIf the building has glass curtain wall, crane or mezzanine floor, canopy, etc., to ensure the safe, steel structure will be increased.If you are looking for a competitive price and good quality steel buildings manufacturer, please contact KXD for our advice. Fill the form or send us an email to request a quotation to KXD's professional advisory team.
Offer request
Type of Building
Please state type of building, ie: workshop, warehouse, hall, hangar, farm, office, hotel, etc.
Dimensiona(width)b(length)h1(wall height)h2(total height)




Construction Site
Roofing and Wall(1) sandwich panel (2) profile steel sheets (3) steel sheet+glasswool blanket (4) no walls-only roof with structures
Contact Name
Company Name
Phone Number
Email
Additional info
Send us sketches, drawings or the project, if you have

Main Structure(Steel tube truss system ) we adaopt hot-dip galvanized C section or steel tube truss beam to reduce sef-weight of design load and dosage of thesteel. At the same time, hot-diped galvanized can widely improve anti-corrosion of the steel. (The construction cycle of the steel structure work is short, which reduces the cost of the project effectively. The steel structure has strong shock resistance and can improve the comprehensive anti-seismic property of the whole house).Substructure( Cold-formed thin-walled steel)Roof purlin uses the hot-dip galvanized Z or C section. The way to continuous lap makes the steel frame as a whole. Wall purlin uses the hot-dip galvanized C section steel. All components adopt bolted connection, no welding, which makes the structure overall appearance smooth.Prefabricated steel structure workshop is a mordern prefabricated building to storage and process. The steel warehouse can be used for rubber factory, steel structure manufacture, car process, etc. It also can be a storage building to store the goods after manufacturing.Now more and more factory can use steel warehouse, which is more convinient and easy to install.Office, apartment, etc., these kind of commercial building frame can be also steel structure.Meanwhile, we can design and manufacture the poultry house according to customer's requrement.Besides, our KXD company can manufacture equipment, which can be combined with steel structure chicken house and give you the best choice.
Packing and shipment Any more information, pls contact Ferchichi. welcome to write your inquiry in the following blank.