Steel Structure Warehouse Workshop Steel Building Steel Material

Steel Structure Warehouse Workshop Steel Building Steel Material

China Design Prefabricated Steel Structure Building with CE Certification Advantage: High quake-proof, water proof and f
Basic Info
Model NO. GMS042
Type H-Section Steel
Standard GB, ASTM
Trademark Carbon Structural Steel, OEM
Forming Welded
Connection Form Bolt Connection
Member Steel Beam
Type of Steel For Building Structure High-Strength Steel
Carbon Structural Steel Q345b
Residential Wall Structure Wallboard
Application Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Product Name China Design Refabricated Steel Structure Building
Surafce Painting and Hot DIP Galvanize
Size According to Customer Requirement
Steel Grade Q235 and Q345b
Main Frame Q345 Welded H Beam
Secondary Frame Q235, C or Z Purlin
Accessories Skylight, Gutter, Downpipe, etc
Window PVC or Aluminum Alloy
Door Panel Sliding or Electric Rolling-up
Color off-White, Red, Blue or Customized
Transport Package Plastic Film
Specification CUSTOMIZED
Origin Qingdao, China
HS Code 7308900000
Production Capacity 8000t Per Year
Product Description
China Design Prefabricated Steel Structure Building with CE Certification

Steel Structure Warehouse Workshop Steel Building Steel Material

Steel Structure Warehouse Workshop Steel Building Steel Material

Steel Structure Warehouse Workshop Steel Building Steel Material


Advantage:
High quake-proof, water proof and fire proof, High space efficiencyEasy to install and maintenanceFast construction, save time and labor costPrefabricated and customized designNice appearance
Light weight, high strength, 50years durable use, no construction waste.Easy move, materials can be recycled used, environmentally;Used as factory, warehouse, office building, aircraft hangar etc;Structural durabilities, low maintenance.

Technical Parameters:
1. Main Steel Structure: Use build-up steel column, welded H-beam steel
2. Purlin: C-type steel
3. Roop panel: Single steel sheet or sandwich panel
4. Wall panel: The same to roof panel
5. Tie bar: Welded-round tube
6. Brace: Round steel
7. Column brace and lateral brace: Angle steel
8. Crane: 3T-30T
9. Angle brace: Hot-rolled angle steel
10. Edge: Color plate
11. Gutter: Stainless steel
12. Down pipe: PVC Pipe
13. Door: Sandwich-panel door or Rolling door
14. Window: Aluminum alloy window or PVC window

Product Description:
Product NameChina design refabricated Steel Structure Building with CE Certification
Size Based on your requirement
ColumnLength4000-12000mm

 

Main Component

 


Thicknessweb plate 6-40mm
Height200-1200mm
ColorAvailable
Basecement and steel foundation bolts
Main FrameWelded H beam; Hot rolling section beam
MaterialQ345B;Q235
Purlin C purlin or Z Purlin size from C 120 - 320 , Z 100 -20
BracingX type or other type bracing made from angle and round pipe
Boltgeneral bolt and high -strength bolts
Roof and Wallsandwich panel and steel corrugated sheet
Doorsliding and rolling up door
Windowsliding aplastic steel window or aluminiun alloy window
Frame surfacepainted or hot dip galvanized
Sheet0.35 -0.8 mm galvanized sheet
Accessorysemi - transparent skylight belts , ventilators , downpipe and galvanized gutter etc .

Project view:Company Profile:

Steel Structure Warehouse Workshop Steel Building Steel Material

Steel Structure Warehouse Workshop Steel Building Steel Material

 

Our Service:
1. Professional design and engineering team:
Full solution for site camp design. We could make the design for whole camp as per your requirement.

2. Procurement and Manufacture for all material for prefabricated building:
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.

3. Site management & Installation supervision:
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK

 

Packing & Delivery:
Inspection: 50% inline inspection and 100% full final inspection, make sure all output w/o any mistake
Packing: per customer's requirements or per product sizes, full protection packing
Shipping: per customer's requirements or per container sizes

 

FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.

2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.

3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Contact Info:
Lucy LuQingdao Gemsun steel structure co., Ltd